(909) 729-4086

Concrete parking lot building in Pomona CA - pavement that drains and holds up

Cracked stalls, standing water or broken concrete where trucks turn? We build concrete lots on packed ground that drain right and last.

Gray stamped-concrete patio beside a blue house, with a raised stone planter wall and potted flowers.
  • Fully licensed and insured.
  • Free quotes on site.
  • We reply within 1 business day.

What does it take to build a concrete parking lot in Pomona?

Concrete parking lot building in Pomona, CA starts with checking the ground and deciding how thick the pavement needs to be. Then come the joint layout, the paving and checks on the work as it goes in, so you end up with a lot that drains, carries your traffic and doesn't need much attention.

Most owners who call us are either starting on bare ground or tired of patching an old lot that cracks and holds water. The price moves with the size of the lot, how much old pavement has to come out, how deep we dig for the base, how thick the slab has to be for your trucks, and what the drainage needs. The schedule turns on that same prep work, on the cure, which is the wait before cars can go on fresh concrete, and on how much of your lot has to stay open while we work. If the lot needs a walkway to the front door too, we can pour it in the same run as our concrete sidewalk building work. After I've walked the lot, I'll give you your own figure in a written estimate.

How can you tell your parking lot needs more than patching?

Cracks across the stalls

Cracks that run across parking stalls or wander between the joints usually mean the base underneath moved or the joints didn't do their job. Water gets in, and every season of traffic widens them until pieces start breaking loose.

Water standing after rain

Puddles that sit in the same stalls tell you the lot wasn't sloped toward its drains, or a section has sunk. Standing water softens the ground under the slab, and the low spot keeps getting bigger.

Broken spots where trucks turn

Crumbling or sunken concrete at the entrance and the turn areas usually means the slab was too thin or the base too soft for delivery trucks. Leave it, and the damage creeps into the lanes your customers drive on.

How we handle concrete parking lot building

I start with the ground, because concrete remembers everything you did to it. We dig out the subgrade, the soil the slab sits on, down to firm material, then bring in base and pack it in layers, since loose dirt that's only been raked flat settles and takes the slab with it. Before any forms go up, we plan where the water runs so it heads to the drains and away from buildings. We also plan where the joints go and which lanes delivery trucks will use, so heavy loads stay off the areas built for cars. We set rebar, the steel that holds the slab together if it cracks, where the traffic calls for it. We pour early in the day, because midday heat leaves a weak, dusty top. Then we give it a broom finish, a light texture that keeps tires and shoes from slipping, and cut the control joints, the grooves that tell the concrete where to crack, before it picks its own spots. We also talk through the upkeep down the road, so you know what the lot will ask of you years from now. When budgets get tight, the base is usually the first thing people want to cut because nobody sees it on day one. I'd rather lose the bid than pour on bad ground, since a nice finish on a soft base is just an expensive crack waiting to show up.

A lot rarely stands alone. Light poles, sign posts and low walls along the edge sit on concrete footings, and we pour those as part of the layout so they line up with the joints and curbs. If the building beside the lot has started to sink or crack, that's a job for foundation raising, and it's worth sorting out before new paving goes in against it.

  • Standard dense concrete

    This suits most lots, from a small office to a strip center with deliveries, because it handles heavy, turning traffic well. The water leaves on the slope we build in, so drains and grades get planned from the start.

  • Pervious concrete

    This suits owners who want rain to soak down through the pavement instead of running off it. It doesn't fit every lot, so I'll tell you plainly whether it fits yours and what kind of crew it takes before you commit.

Get a written estimate for your new lot

We reply within one business day. I come out, look at the ground and measure, then send you a free written estimate, and there's no pressure to book.

(909) 729-4086

Concrete parking lot building in Pomona and what the city looks at

In Pomona, any lot with 25 or more spaces, or with 5,000 square feet or more of hard surface, needs the city to approve its stormwater pollution controls before the project is done. So we draw those controls into the layout at the start, where they fit easily, instead of tearing up fresh concrete to add them later. Rules change, so check the current requirements for your lot with Pomona's Building & Safety Division before you settle on a design.

What we see most around here are older lots paved on a skimpy base, now cracked where the trucks turn and puddled in the low stalls. We're based in Pomona and work in the cities around it, and we run into the same worn lots on jobs in Ontario and Chino.

What happens after you call us about a parking lot in Pomona?

  1. Call or send a message

    Call (909) 729-4086 or use the form, and tell us the lot's size, how many spaces you need and what truck traffic you expect. Then we set a time for me to come out.

  2. I walk the lot and measure

    I look at the ground, measure and ask how the lot gets used day to day, then send you a written estimate. It's on paper, so you're not comparing bids from memory.

  3. We pour and walk it with you

    My crew forms and pours while I check the work. Pomona allows construction Monday to Saturday, 7 am to 8 pm, with no work on federal holidays, so we schedule around your busiest hours, and when it's done we walk the finished lot with you before we pack up.

Frequently asked questions

How much does it cost to build a concrete parking lot in Pomona?

The cost depends mostly on the lot's size, how much old pavement comes out, how deep the base has to go and how thick the slab needs to be for the traffic it carries. Drainage and any stormwater controls the city requires add to it, and pervious concrete prices differently from a standard pour. I'll put your figure in writing after I've seen the lot.

How long does a concrete parking lot last before it needs repairs?

A concrete lot that's designed and built for the way it's used gives many years of service with little maintenance, and the first real repairs usually come at 10 to 15 years. Those are spot repairs on the areas that have worn, which makes them the cheapest fix and the least disruptive to your parking. It's worth setting a little aside for them now so they don't surprise you.

Does repaving my parking lot in Pomona count as new development?

It can. Pomona's stormwater rules count construction, rehabilitation, redevelopment and reconstruction as development, but not routine maintenance that keeps the lot's original line and grade. If your job sits close to that line, ask the city office we linked above before work starts.

Is pervious concrete a good choice for a parking lot?

It can be, but it needs a crew with specialized experience, because it behaves differently from regular concrete even though it comes from the same suppliers and trucks. If you're weighing it, ask every bidder how much of it they've placed.

Do parking lots in California have to meet accessibility rules?

Yes. The state's accessibility code calls for barrier-free design in the site work it covers, so people with disabilities can use the lot. Additions, alterations and structural repairs have to meet the same provisions as new work, except where the code says otherwise, so plan for it on a rebuild too.

What causes cracks in a new concrete parking lot?

Concrete shrinks as it sets, so it will crack somewhere, and joints are cut into the pavement to steer those cracks to planned spots. Cracks in random places usually mean the joints were skipped, cut late or laid out poorly, or the base moved underneath. Ask any contractor you're considering to show you where the joints will go on your lot.

Pomona, CA

Plan your new lot before the pour

Have the lot's size, the number of spaces and the truck traffic you expect handy when you call, and we can get the layout right from the first visit.

(909) 729-4086Request a quote